Service Support
Feedback / Message
If you have any comments or suggestions, please leave us a message!
Detailed Information
Warm congratulations on the successful passing of the expert review for the surface treatment project.
Time:
2016-05-19
On June 10, 2013, the Yuanping Municipal Development and Reform Bureau convened an expert review meeting in Yuanping to examine the Feasibility Study Report for the “Surface Treatment New Project of Shanxi Jiacheng Hydraulic Co., Ltd. for Auxiliary Equipment and Hydraulic Cylinder Production in Open-Pit Coal Mines” (hereinafter referred to as the “Feasibility Study Report”). Representatives from the Yuanping Municipal Development and Reform Bureau, the Yuanping Municipal Environmental Protection Bureau, the Taiyuan Surface Engineering Association, and other relevant units and departments attended the meeting. During the session, the expert panel carefully reviewed the Feasibility Study Report and listened to presentations by the project proponent and the report‑preparing entity. Following thorough deliberation, it was determined that the production process and technology meet domestic standards; the hard chromium plating line employs a closed-loop, zero‑emission system that complies with international emission standards; and the wastewater and exhaust‑gas treatment technologies satisfy national environmental protection requirements. The expert panel unanimously approved the Feasibility Study Report.
Keywords:
晋公网安备14098102000065